The PECO Service and Meter Application form is a critical document for anyone seeking electric service from PECO, whether for new construction, service upgrades, or temporary needs. This application requires detailed information to ensure efficient processing and installation of electric services. Applicants must provide their name, service location, and identification numbers, such as a driver's license or Social Security number. Additionally, the form includes sections for specifying the type of service requested, the nature of the construction project, and the load characteristics, including connected kilowatts and demand estimates. The electrician or contractor's details must also be filled in, including a tax identification number. It is essential to indicate the current construction status and the desired service date, avoiding vague terms like "as soon as possible." Completing the application accurately is crucial, as incomplete submissions may lead to delays. Finally, a signature and date are mandatory to validate the application. Understanding these requirements will facilitate a smoother process for obtaining electric service from PECO.

Document Preview

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER
Please refer to the sample application while reviewing the following notes. The letters below
correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE
"SAMPLE" FORM
A. After reading the instructions at the top of the application, locate the PECO
regional office in which the service is requested. Check the appropriate box and
mail or fax the completed application to the appropriate regional office.
B. Complete the fields for customer's name and service location. Customer's
Driver's License Number or Social Security Number is now required.
Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.
(**) Use the address of the service when applying for underwriter's inspection.
C. Complete the fields for customer's PECO billing address or account number
(within last 60 days).
D. Complete fields regarding you as the electrician or contractor, and indicate
where you would like the reply sent. The Electrician/Builder Tax Identification
number is now required. Also, please include the date you would like the reply
returned to you.
E. Indicate your current construction status, and include the date PECO service is
requested. Please avoid using "as soon as possible".
F. thru J. Indicate the following:
Type of Request
Type of Service (include number of units and area per unit)
Service Characteristics
Meter Information
Heating/Air Conditioning
K. Complete the table concerning the load characteristics of the service. For each
applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW
Demand, and 3) Maximum Winter KW Demand.
L. Complete the table concerning motor information.
M. If compensated metering will be used, indicate totalizer and general load (KW).
N. Include any additional comments.
O. Application MUST be signed and dated. Forms Rev. 5/18
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information
may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests
may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding
with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the
right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR
DEMOLITION REQUEST
NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com
PHILADELPHIA
COUNTY
830 S. Schuylkill Ave.
Philadelphia, PA 19146
Email:PhilaNewBusiness@e
xeloncorp.com
Fax # (215) 731-2327
DELAWARE & CHESTER COUNTIES
1050 W. Swedesford Rd.
Berwyn, PA 19312
Email:DelChesterServiceApplications@ex
eloncorp.com
Fax # (610) 725-1416
BUCKS & MONTGOMERY
COUNTIES
400 Park Ave.
Warminster, PA 18974
Email:Bucksmontserviceapplications@e
xeloncorp.com
Fax # (215) 956-3240
NEW RESIDENTIAL
CONSTRUCTION
(All Counties)
400 Park Ave.
Warminster, PA 18974
Email:NRCGMETERORDERS@P
eco-Energy.com
Fax # (215) 956-3380
CUSTOMER NAME Tax ID # or SSN
TYPE OF REQUEST
New Service
Temporary Service
Separation of Wiring
Load Increase/Decrease
Upgrade/Changes
Service Relocation
Reintroduction of Service
Demolition (Remove
Service)
Make-Safe (De-
energize/Cover)
** ADDRESS TO BE SERVED APARTMENT/LOT #
CITY, STATE ZIP CODE TYPE OF SERVICE: Please include site plan.
RESIDENTIAL COMMERICAL
Single House
Apartment
Duplex
Mobile Home
Modular Home
Town House
Store
Industrial
Restaurant
Office
Warehouse
Other _____________________________ Other _____________________________
Area of Building _______________________ Sq. Ft.
UTILITY POLE# SUBDIVISION/DEVELOPMENT TOWNSHIP/MUNICIPALITY/WARD#
* If Applicable
** Please use this address when applying for underwriter’s inspection
SERVICE CHARACTERISTICS:
PHASE VOLTS WIRES
Underground Aerial 3 240 3
AMPS _________
3 120/240 4
PHASE VOLTS WIRES 3 120/208 4
1 120 2 3 277/480 4
1 120/240 3 3 13200 3 or 4
2 120/240 5 3 33000 3 or 4
CUSTOMERS BILLING ADDRESS
-OR-
PECO ENERGY ACCOUNT#
CITY, STATE ZIP CODE TELE. #
SEND REPLY TO:
ELECTRICIAN’S OR BUILDER’S NAME METER INFO:
Two Meters, Commercial (General/Totalizer)
Single Meter Required Multiple Meter Total No. _____________
ADDRESS Reply Requested by:
/ /
HEATING/AIR CONDITIONING:
Central Air _____ Tons
Natural Gas
Resistance
Propane
Heat Pump _____ Tons
Type Back-Up _________
Other ________________
City, State ZIP CODE CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:
TYPE
CONNECTED
LOAD (kW)
PECO ENERGY USE ONLY (DEMAND)
TELE. # E-MAIL ADDRESS
SUMMER (kW) Winter (kW)
LIGHTING
CURRENT CONSUTRCTION STATUS:
Not Started Date Customer Will Start Work: _____/_____/_____ In Progress Completed
Approximate Date Service Requested: _____/_____/_____
HEATING
AIR/COND.
TANKLESS WATER HTR
MISC
CUSTOMER COMMENTS/ DESCRIPTIN OF WORK
TOTAL
Include single line diagram and substation arrangement if appropriate.
LARGEST MOTOR SPECIFICATIONS
QUANTITY
TOTALIZER LOAD
SIZE (HP)
KW
LOCKED ROTOR CURRENT
MOTOR CODE LETTER
SUBMITTED BY: _________________________________ DATE: ______________________
PHASE
GENERAL LOAD
VOLTAGE
A
B
F
C
D
E
G
I
J
K
M
L
N
O
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
KW
PURPOSE
INFORMATION BELOW WILL BE FILLED IN BY PECO:
Service Request No.
BUS/MAJ ACCT REP TELEPHONE DATA RECEIVED DESIGNER
TELEPHONE
DATA RECEIVED
POL SUB RATE RIDER CONTRACT LIMITS SIC NUMBER T
NUMBER
DATE REPLY
COMPLETED
AMPS WIRES VOLTAGE PHASE CIRCUIT C-QUAD T-QUAD LOAD (KVA)
SUMMER_____WINTER ____
SERVICE CHARACTERISITICS Select One from Each
SERVICE TYPE
Aerial Underground URD
RATE:
Residential Comm (Non-
Demand)
Comm (Demand) HT/PD
GENERATION PROCUREMENT CLASS:
Class 1 (Residential)
Class 3 (Commercial, 100kW to 500kW)
Class 2 (Commercial, less than 100kW)
Class 4 (Commercial, greater than 500kW)
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load
estimates for the first year of service. The customer’s Procurement Class will be adjusted each year,
based on actual usage.
METER TYPE:
KWH IND. DEMAND RECORDER TOU
SERVICE PHASING:
SINGLE PHASE TWO PHASE THREE PHASE
POLE # / MH # LOCATION CUT THROUGH DATE
SERVICE REQUIREMENTS:
Present Service OK
Taps Only
Loop Only
See Job # _________________________________
METERING LOCATION AND REQUIREMENTS:
Present Location: Meter # _______________ CTs-
________
PTs-________
Indoo
r
Outdoor On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above
Ground
ADVANCE NOTIFICATIONS:
Underwriter’s Cert.
Required
Yes No
Customer to Trench Yes No
Permit Required Yes No State
Other
_______________________
ACT 222 Cert. Required Yes #
_____________
No
N/A
PA One Call #
___________________________
Date
__________________________
Gas BTCO CATV Other
___________________
Date
__________________________
CUSTOMER BILLING:
Advance Billing
Required
Yes
No Customer
Charges:
$_______________
__
$_______________
__
Cust. #
_________________________
Date
___________________________
BTCO #
________________________
Date
___________________________
CATV #
________________________
Date
___________________________
Other
__________________________
Date
___________________________
SKETCH / INSTRUCTIONS
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information
may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests
may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding
with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the
right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR
DEMOLITION REQUEST
NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com
PHILADELPHIA COUNTY
830 S. Schuylkill Ave.
Philadelphia, PA 19146
Email:PhilaNewBusiness@ex
eloncorp.com
Fax # (215) 731-2327
DELAWARE & CHESTER COUNTIES
1050 W. Swedesford Rd.
Berwyn, PA 19312
Email:DelChesterServiceApplications@exe
loncorp.com
Fax # (610) 725-1416
BUCKS & MONTGOMERY
COUNTIES
400 Park Ave.
Warminster, PA 18974
Email:Bucksmontserviceapplications@e
xeloncorp.com
Fax # (215) 956-3240
NEW RESIDENTIAL
CONSTRUCTION
(All Counties)
400 Park Ave.
Warminster, PA 18974
Email:NRCGMETERORDERS@P
eco-Energy.com
Fax # (215) 956-3380
CUSTOMER NAME Tax ID # or SSN
TYPE OF REQUEST
New Service
Temporary Service
Separation of Wiring
Load Increase/Decrease
Upgrade/Changes
Service Relocation
Reintroduction of Service
Demolition (Remove
Service)
Make-Safe (De-
energize/Cover)
** ADDRESS TO BE SERVED APARTMENT/LOT #
CITY, STATE ZIP CODE TYPE OF SERVICE: Please include site plan.
RESIDENTIAL COMMERICAL
Single House
Apartment
Duplex
Mobile Home
Modular Home
Town House
Store
Industrial
Restaurant
Office
Warehouse
Other _____________________________ Other _____________________________
Area of Building _______________________ Sq. Ft.
UTILITY POLE# SUBDIVISION/DEVELOPMENT TOWNSHIP/MUNICIPALITY/WARD#
* If Applicable
** Please use this address when applying for underwriter’s inspection
SERVICE CHARACTERISTICS:
PHASE VOLTS WIRES
Underground Aerial 3 240 3
AMPS _________
3 120/240 4
PHASE VOLTS WIRES 3 120/208 4
1 120 2 3 277/480 4
1 120/240 3 3 13200 3 or 4
2 120/240 5 3 33000 3 or 4
CUSTOMERS BILLING ADDRESS
-OR-
PECO ENERGY ACCOUNT#
CITY, STATE ZIP CODE TELE. #
SEND REPLY TO:
ELECTRICIAN’S OR BUILDER’S NAME METER INFO:
Two Meters, Commercial (General/Totalizer)
Single Meter Required Multiple Meter Total No. _____________
ADDRESS Reply Requested by:
/ /
HEATING/AIR CONDITIONING:
Central Air _____ Tons
Natural Gas
Resistance
Propane
Heat Pump _____ Tons
Type Back-Up _________
Other ________________
CITY, STATE ZIP CODE CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:
TYPE
CONNECTED
LOAD (kW)
PECO ENERGY USE ONLY (DEMAND)
TELE. # E-MAIL ADDRESS #
SUMMER (kW) Winter (kW)
LIGHTING
CURRENT CONSUTRCTION STATUS:
Not Started Date Customer Will Start Work: _____/_____/_____ In Progress Completed
Approximate Date Service Requested: _____/_____/_____
HEATING
AIR/COND.
TANKLESS WATER HTR
MISC
CUSTOMER COMMENTS/ DESCIPTION OF WORK:
TOTAL
Include single line diagram and substation arrangement if appropriate.
LARGEST MOTOR SPECIFICATIONS
QUANTITY
TOTALIZER LOAD
SIZE (HP)
KW
LOCKED ROTOR CURRENT
MOTOR CODE LETTER
SUBMITTED BY: _________________________________ DATE: ______________________
PHASE
GENERAL LOAD
VOLTAGE
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
KW
PURPOSE
INFORMATION BELOW WILL BE FILLED IN BY PECO:
Service Request No.
BUS/MAJ ACCT REP TELEPHONE DATA RECEIVED DESIGNER
TELEPHONE
DATA RECEIVED
POL SUB RATE RIDER CONTRACT LIMITS SIC NUMBER T NUMBER DATE REPLY
COMPLETED
AMPS WIRES VOLTAGE PHASE CIRCUIT C-QUAD T-QUAD LOAD (KVA)
SUMMER_____WINTER
____
SERVICE CHARACTERISITICS Select One from Each
SERVICE TYPE
Aerial Underground URD
RATE:
Residential Comm (Non-Demand) Comm (Demand) HT/PD
GENERATION PROCUREMENT CLASS:
Class 1 (Residential)
Class 3 (Commercial, 100kW to 500kW)
Class 2 (Commercial, less than 100kW)
Class 4 (Commercial, greater than 500kW)
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for
the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage.
METER TYPE:
KWH IND. DEMAND RECORDER TOU
SERVICE PHASING:
SINGLE PHASE TWO PHASE THREE PHASE
POLE # / MH # LOCATION CUT THROUGH DATE
SERVICE REQUIREMENTS:
Present Service OK
Taps Only
Loop Only
See Job # _________________________________
METERING LOCATION AND REQUIREMENTS:
Present Location: Meter # _______________ CTs- ________ PTs-________
Indoor Outdoor On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground
ADVANCE NOTIFICATIONS:
Underwriter’s Cert. Required Yes No
Customer to Trench Yes No
Permit Required Yes No State Other _______________________
ACT 222 Cert. Required Yes # _____________ No N/A
PA One Call # ___________________________ Date __________________________
Gas BTCO CATV Other ___________________ Date __________________________
CUSTOMER BILLING:
Advance Billing Required Yes
No Customer Charges:
$_________________
$_________________
Cust. # _________________________ Date ___________________________
BTCO # ________________________ Date ___________________________
CATV # ________________________ Date ___________________________
Other __________________________ Date ___________________________
SKETCH / INSTRUCTIONS

Form Specifications

Fact Name Details
Application Purpose The form is used to request electric service and meter installation from PECO.
Required Information Applicants must provide their name, service location, and either a driver's license number or social security number.
Service Types Available service types include new service, load increase/decrease, temporary service, and demolition requests.
Construction Status Applicants must indicate their current construction status and the date service is requested.
Load Characteristics A table must be completed detailing connected kilowatts (KW), maximum summer KW demand, and maximum winter KW demand.
Meter Information Applicants need to specify if a single meter or multiple meters are required for their service.
Inspection Requirement All work must comply with PECO's Electric Service Requirements manual and be inspected by an approved agency.
Application Submission The completed application must be mailed or faxed to the appropriate PECO regional office based on the service location.
Governing Laws Applications are governed by Pennsylvania Public Utility Commission regulations.
Response Time PECO reserves the right to cancel requests if no communication is received within 90 days of their response.

Peco Service And Meter Application: Usage Guidelines

Completing the PECO Service and Meter Application form is an essential step in securing electric service for your property. By following these clear steps, you will provide all the necessary information to facilitate the process efficiently.

  1. Begin by reading the instructions at the top of the application form.
  2. Locate the PECO regional office relevant to your service request and check the appropriate box.
  3. Fill in your name and the service location. If applicable, include the PECO Energy pole number and/or Lot number.
  4. Provide your Driver's License Number or Social Security Number as required.
  5. Complete the billing address section or include your PECO account number if you have one from the last 60 days.
  6. Provide information about your electrician or contractor, including their Tax Identification number and the desired reply date.
  7. Indicate the current construction status and the date you are requesting PECO service.
  8. Specify the type of request you are making, such as new service, load increase, or demolition.
  9. Detail the type of service you need, including the number of units and area per unit.
  10. Complete the service characteristics section, including phase, volts, and wires.
  11. Fill out the meter information section, indicating if you require a single meter or multiple meters.
  12. Provide details on load characteristics, including connected KW and maximum summer and winter demand.
  13. Include motor information if applicable.
  14. If compensated metering is being used, indicate the totalizer and general load in KW.
  15. Write any additional comments or notes in the designated section.
  16. Finally, ensure that you sign and date the application before submission.

After completing the form, you can mail or fax it to the appropriate PECO regional office. Make sure all information is accurate and complete to avoid delays in processing your application. If you have any questions, consider reaching out to PECO for assistance.

Your Questions, Answered

What is the purpose of the PECO Service and Meter Application form?

The PECO Service and Meter Application form is used to request electric service and meter installation from PECO. It serves as a formal application that provides necessary information about the customer, service location, and the type of electrical service needed. This application is essential for ensuring that PECO can process requests efficiently and accurately.

What information is required to complete the application?

To complete the application, you must provide your name, service location, and either your Driver's License Number or Social Security Number. Additionally, you need to include your PECO billing address or account number, details about the electrician or contractor, and the type of service requested. Specific load characteristics and motor information are also required, along with any additional comments you may have.

How do I submit the application?

You can submit the completed application by mailing or faxing it to the appropriate PECO regional office based on your service location. Ensure that you have checked the correct regional office box on the form to avoid delays in processing.

What happens if I do not provide all the required information?

Incomplete applications may lead to delays in processing. It is crucial to provide all requested information accurately to ensure a smooth application process. PECO may contact you for additional information if necessary, which could further extend the processing time.

Is there a specific timeframe for receiving a response after submitting the application?

PECO reserves the right to cancel your request if no further communication is received from you within 90 days of their response date. Therefore, it is important to monitor your application status and respond promptly to any inquiries from PECO.

What should I do if I need to demolish a building?

If you are demolishing a building and need PECO to remove electric or gas facilities, you must call 8-1-1 (PA One Call) to initiate a demolition request. This step is crucial for ensuring that all safety protocols are followed during the demolition process.

Can I apply for service if I have not had PECO service in the last 60 days?

If you have not had PECO service within the last 60 days, you must complete a credit application and agreement as part of your request. This requirement helps PECO assess your eligibility for service and any associated terms.

What should I do if I have additional comments or special requests?

You can include any additional comments or special requests in the designated section of the application. Providing this information helps PECO understand your specific needs and can facilitate a more tailored service experience.

Common mistakes

  1. Not Reading Instructions Carefully: Many applicants overlook the initial instructions provided at the top of the application. This can lead to incomplete submissions or incorrect information being provided.

  2. Incorrect Regional Office Selection: Applicants sometimes fail to check the appropriate box for the PECO regional office where the service is requested. This mistake can cause delays in processing the application.

  3. Missing Required Identification: It's essential to include either a Driver's License Number or Social Security Number. Omitting this information can lead to immediate rejection of the application.

  4. Inaccurate Service Address: Providing an incorrect service address can complicate the installation process. Always double-check the address and ensure it matches the location where service is needed.

  5. Neglecting to Specify Construction Status: Failing to indicate the current construction status can create confusion. It's vital to provide accurate details, including the date when service is requested.

  6. Incomplete Load Characteristic Information: The application requires detailed load characteristics, including connected KW and maximum demand for both summer and winter. Incomplete data here can hinder service planning.

  7. Forgetting to Sign and Date the Application: A common oversight is not signing or dating the application. This step is crucial for the application to be considered valid.

  8. Omitting Additional Comments: If there are specific needs or circumstances related to the service request, failing to include them can lead to misunderstandings. Use the comments section to clarify any unique situations.

Documents used along the form

When applying for electric service with PECO, several additional forms and documents may be required to ensure a smooth process. Each of these documents serves a specific purpose and helps to provide the necessary information to facilitate your application. Here is a brief overview of these important forms.

  • Site Plans: These detailed drawings illustrate the layout of the property, including the location of buildings, utilities, and other features. Site plans help PECO assess service requirements and potential installation challenges.
  • Single Line Diagram: This document provides a simplified representation of the electrical system, showing how different components are connected. It is crucial for understanding the flow of electricity and identifying any potential issues.
  • Substation Arrangement: This document outlines the configuration of the electrical substation that will serve your property. It includes information about transformers, switches, and other equipment necessary for service delivery.
  • Credit Application: If you have not had PECO service within the last 60 days, this application is necessary to establish your creditworthiness. It helps PECO determine the terms of service and any required deposits.
  • Underwriter's Certificate: This certificate verifies that your electrical installation meets local codes and standards. It is often required before service can be activated.
  • Permits: Depending on your project's scope, various permits may be required from local authorities. These permits ensure that all construction and electrical work complies with safety regulations.
  • Demolition Request: If you are demolishing a building and need PECO to remove electric or gas facilities, this request must be submitted. It ensures that all utility services are safely disconnected.

Understanding these forms and documents can help you navigate the application process with PECO more effectively. By preparing the necessary information in advance, you can minimize delays and ensure a successful service request.

Similar forms

  • Application for Electric Service: Similar to the Peco Service and Meter Application, this document also requires detailed information about the customer and service location. It includes sections for the type of service requested and specific load characteristics, ensuring accurate service provision.
  • Building Permit Application: This document requires information about the construction project, including the address and type of work being done. Like the Peco form, it emphasizes the importance of providing accurate details to avoid processing delays.
  • Utility Connection Request Form: This form is used to request connections for various utilities, including electricity and water. It shares similarities with the Peco application in that it collects customer identification and service location details.
  • Service Change Request Form: This document is used to request changes to existing utility services. It parallels the Peco form by requiring information on the current service status and the nature of the requested changes.
  • Meter Installation Request: This request form specifically addresses the installation of utility meters. It includes sections for customer details and service characteristics, similar to the Peco application which requires meter information.
  • Demolition Notification Form: This form is used when a building is being demolished and utilities need to be disconnected. It shares the requirement of providing specific details about the service location and the nature of the request, akin to the Peco application.

Dos and Don'ts

When filling out the PECO Service and Meter Application form, keep these important tips in mind:

  • Do read the instructions carefully before starting.
  • Don't leave any required fields blank; incomplete applications may delay processing.
  • Do provide accurate information, including your driver's license or social security number.
  • Don't use vague terms like "as soon as possible" for service requests; specify a clear date.
  • Do indicate your current construction status accurately.
  • Don't forget to sign and date the application; it is mandatory.
  • Do include any additional comments or specific requests that may help your application.

Misconceptions

Misconceptions about the PECO Service and Meter Application form can lead to confusion and delays in obtaining electric service. Here are six common misunderstandings:

  • Only the homeowner can submit the application. Many believe that only the property owner can fill out and submit the application. However, electricians or contractors can also submit the form on behalf of the homeowner, provided they include their Tax Identification Number.
  • Driver's license or Social Security number is optional. Some people think that providing a driver's license number or Social Security number is not necessary. In fact, this information is now a required part of the application process to ensure proper identification and service.
  • All service voltages are available everywhere. It's a common belief that any type of electric service can be requested regardless of location. However, not all service voltages are available in every area, so it's important to check with PECO about what is offered in your specific location.
  • Incompleteness won't affect the application. Some applicants might think that minor omissions won't matter. In reality, incomplete information can result in significant delays in processing the application, as PECO requires all fields to be filled out accurately.
  • The application can be submitted at any time. Many assume that they can submit the application whenever they want. However, if there is no further communication from the customer within 90 days of PECO's response, the request may be canceled. Timely follow-up is crucial.
  • Comments and additional information are not necessary. Some may think that including comments or additional details is optional. However, providing extra context or information can help PECO process the application more efficiently and address any unique circumstances related to the service request.

Key takeaways

Here are some key takeaways for filling out and using the Peco Service and Meter Application form:

  • Read the Instructions: Begin by carefully reviewing the instructions at the top of the application to ensure all requirements are understood.
  • Regional Office: Identify the appropriate PECO regional office for your service request and send the completed application to that location.
  • Required Information: Provide your name, service location, and either your Driver's License Number or Social Security Number. Include PECO Energy pole # or Lot # if applicable.
  • Electrician Details: Fill out the electrician or contractor's information, including the Tax Identification number and the preferred reply date.
  • Service Request Type: Clearly indicate the type of service request, such as new service or load increase, and specify the service characteristics.
  • Load Characteristics: Accurately complete the load characteristics table, detailing connected KW and maximum demand for both summer and winter.
  • Signature Required: Ensure the application is signed and dated before submission to avoid delays in processing.